Skip to content

Dockets for concrete demolition and removal

Controlled demolition crews saw, drill, split and remove, and each part is charged a different way. Core Docket puts the metres, the hours, the equipment days and the loads on one signed docket and prices them from your price list. The office gets a draft invoice that already has the disposal on it.

Free for a month, no credit card. Every feature included: no tiers, no add-ons, free updates.

Work priced three ways on one docket

By measurement

Saw cuts per metre by depth, core holes by diameter and depth, and wire sawing per square metre, priced the same way as a cutting job.

By the hour and the person

Labour, splitting, breaking and grinding go on as hours, and labour multiplies by the number of people, so three people for eight hours is 24 hours.

By the day and the item

Equipment such as a generator or water pump can be charged per day, and disposal per item, such as a bin, a truck load or a slurry drum.

An example removal docket

Removing a section of slab: cut, split, load out. Every rate here is an example only.

Line on the docketMeasurementExample rateExample price
Flat sawing, concrete, 150mm deep40 m$14.00 per m$560.00
Hydraulic splitter4 hours$90.00 per hour$360.00
Labour8 hours × 3 people$95.00 per person-hour$2,280.00
Generator1 day$150.00 per day$150.00
Disposal, truck load2 loads$450.00 per load$900.00
Total for the docket$4,250.00 ex GST

Example figures only. Each of these lines is a section on your price list, set up with the measurement you charge by.

How a demolition price list is set up

Core Docket has no special demolition module. Your price list is loaded into sections, and each section is set up with the way that work is measured: metres, depth, holes, hours, days or a count. That is enough for most removal work, because the docket only needs to record what was done and how much of it.

Disposal is usually a count. A truck load, a skip, a 1,000 litre IBC or a 220 litre drum each becomes an item with its own price, and the crew enter how many. Items you price by hand, such as a load of mixed waste, can be left at $0. The invoice marks them "No price yet" and asks before sending them to your accounting suite at $0.

Minimum charges, callout fees and after-hours minimums apply the same way as on a cutting job, worked out from the job's actual times. See how the rate card handles sections and minimums.

Multi-day jobs and crews of any size

  • A removal job booked across several days keeps one job number, and each day's docket adds to one draft invoice with the lines marked by day.
  • Two or three people can be on one job, and it shows on each of their rows on the schedule board, with double bookings flagged.
  • A booking can require a PO or order number before it is saved, which head contractors usually ask for on the invoice.
  • A month of work for one builder can go on a single invoice: filter dockets by customer and dates and tick them.
  • Time on site is compared with the work recorded at the end of each docket, so a missed hour of labour shows while the crew are still there.
  • A skip bin or IBC left on site can go out on hire: a drop-off docket when it arrives, a collection docket when it comes back, and the hire charged at collection.

Safety records and the customer's copy

SWMS and site sign-on

SWMS sign-on, Take 5, toolbox talks and plant pre-starts are included at no extra cost. Every feature is in one plan, with no tiers or add-ons. See SWMS and pre-starts.

Stop questions

A safety question on the docket can stop it going further on the wrong answer, for example services not located, so the crew call the site manager first.

A signed copy on your letterhead

The finished docket, with photos and the site contact's signature, is emailed to the customer as a PDF on your letterhead.

Questions

Does Core Docket work for concrete demolition?

Yes, for controlled concrete demolition and removal priced by measurement, hours and loads. Sawing, drilling, labour, equipment days and disposal are each set up as sections on your price list and priced on one signed docket.

Can labour be charged per person per hour?

Yes. A labour section can be priced as hours × the number of people, so the crew enter the hours and how many people worked them.

How do we charge for disposal and truck loads?

Each disposal item, such as a truck load, skip or slurry drum, is set up as a priced item and the crew enter how many. Items you price by hand can be left at $0 and are flagged on the invoice before it is sent.

Can one demolition job run over several days?

Yes. A job booked across several days keeps one job number, and each day's docket adds to the same draft invoice.

Does the invoice go to our accounting software?

Yes. The finished docket becomes a draft invoice that you check and send to your accounting suite with your account and GST codes. See which accounting suites connect today.

Try it free. We'll help you roll it out.

Send us your price list and logo. We set up your rate card, build your docket and letterhead, and get your first crew running. Free for a month, no credit card.